Projects

Foam Kid Fire Fighting Pipe Line-Qatif

Foam Kid Fire Fighting Pipe Line-Qatif

  • Client
    MultiLines Construction And Technical Services
  • Duration
    3months
  • Location
    Qatif
  • Value
    650,000.00 SR
  • Year Completed
    2010
 
BULK PLANT-testing and commissioning of gt3 substation electrical equipment’s in hawiay gas plant.
Includes testing and commissioning of 13.8 kv mv metal glad double-ended switchgears, 4.16 kv mv motor control centers, 480 volts lvmetal clad double-ended switchgears, and power transformer.
 